Knacklore

← All decks

Cover of Contingency Planning Patterns

Contingency Planning Patterns

Keep running when a person, site or system fails.

Methods for keeping a business running when a person, site, system, supplier or channel suddenly fails. For managers and operations leads, the cards help you map what cannot stop, find single points of failure and key-person risk, plan for outside failures, write fallbacks people can follow under stress, rehearse them in drills and recover in the right order afterwards.

49 cards · 7 suits · 5 recipes · 2 missions

What's inside

A few cards

Illustration for Critical Activities List
Map

Critical Activities List

Name the handful of things that must keep happening, and let everything else wait.

Illustration for Single Point Hunt
Weak Points

Single Point Hunt

Find every link that has nothing behind it.

Illustration for Supplier Criticality Tiers
Suppliers And Sites

Supplier Criticality Tiers

Sort suppliers by how fast and how hard their failure would hit you.

One card in full

Illustration for Plan Read-Through
Drill

Plan Read-Through

Read the plan aloud with its owners and fix every point where someone stumbles.

The cheapest exercise of all is reading the plan out loud with the people who would have to carry it out. Plans written at a desk are full of assumptions that sound fine in silence and fall apart when spoken: a phone number nobody has, a step that needs a missing key, a decision nobody is allowed to make.

How to use it

  1. Book an hour with the owners of one critical activity and their deputies.
  2. Read the plan section by section, out loud, with each step read by the person who would do it.
  3. After each step, ask: could you do this now, today, with what you have?
  4. Record every stumble on a flip chart: missing access, unclear wording, wrong contact, impossible timing.
  5. Assign each stumble an owner and a date, and repeat the read-through when they're fixed.

Example

A school's read-through of its building-loss plan stalls on step three: the assembly point is the car park now used for a temporary classroom. They pick a new point that afternoon.

Watch out

  • Reading silently in advance and discussing in general. Aloud, step by step, is the point.
  • Letting the plan author read every step. Owners must speak for their own parts.

It is the warm-up for a Continuity Tabletop, works especially well on First-Hour Card drafts, and ends with a short Hot Wash.

Recipes

Missions

Related decks

Product & Roadmaps Patterns

Go from raw request to features people use.

56 cards

Engineering Practice Patterns

Ship small changes often and sleep at night.

56 cards

UX Principles

Shape interfaces around how people think.

54 cards

← All decks